As you’re all well aware, the Sound Inc staff are ALWAYS doing some kind of DIY down at The Inc.

Current building projects include the removal of the ceiling in Studio 3, with a dual insulated ceiling due to be installed to help with isolating the minimal sound chatter between Studio 3 and Studio 2. The new ceiling will also be equipped with brand new acoustic traps and a new aesthetic that we hope to spread throughout the all our studios across the next 2 years.

Following this, Studio 2 will be having it’s ceiling removed also, with a view to utilising the interesting shape of our pitched roof in the acoustic design and function of the studio. This will come after we relocate our main RCD and consumer unit boards so we have full flexibility when redesigning and rebuilding.